Substation · England, United Kingdom
Leatherhead Grid 33kV Substation
Leatherhead Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 68 MVA of demand headroom and 35.6 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 68 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 35.6 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 172 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.3024, -0.3325 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 316 grid connections (214 operating, 1,694 MW), 303 power plants (109 operating, 1,653 MW), 150 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Merton College grid connection | Grid connection | 98 MW | Planned | 1.1 km |
| Barnett Wood Lane - Battery Storage | Power plant | 98 MW | Permitted | 1.3 km |
| Elmer WTW 174946 grid connection | Grid connection | 3.4 MW | Operating | 1.6 km |
| Cobham Road, Bookham - Solar Farm | Power plant | 49.5 MW | Permitted | 2.8 km |
| Slyfield Farm grid connection | Grid connection | 49.9 MW | Planned | 3.0 km |
| Fair Oak Lane | Power plant | 49.9 MW | Cancelled | 4.5 km |
| Digital Realty LHR13 | Data center | — | — | 7.9 km |
| Redcentric Byfleet | Data center | — | — | 11 km |
| Unit 1 | Data center | — | — | 13 km |
Grid operator and place
Grid connections attached to this substation
More from South Eastern Power Networks plc
- Thanet Grid 33kVsubstation
- Hastings 33kVsubstation
- The Droveway 11kVsubstation
- Edenbridge 11kVsubstation
- Jarvis Brook 6.6kVsubstation
- Chatham Hill 11kVsubstation
- Selhurst 6.6kVsubstation
- Dymchurch 11kVsubstation
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.