Power plant · North Lanarkshire, Scotland, United Kingdom

Locks Street, Coatdyke - Battery Energy Storage Systems

Locks Street, Coatdyke - Battery Energy Storage Systems is a planned power plant in North Lanarkshire, Scotland, United Kingdom, with 45 MW of capacity, operated by Bluestone Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Lanarkshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLocks Street Coatdyke, ML5 3RTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Sept 2025 (reference 25/00935/FUL, planning authority North Lanarkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBluestone EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity45 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.8606, -4.0015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Locks Street, Coatdyke - Battery Energy Storage Systems is the 422nd-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,289th-largest of 3,222 in the United Kingdom by capacity; its 45 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland422nd of 87299,272 MW<0.1%
United Kingdom1,289th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,422nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 15 grid connections (6 operating, 45 MW), 13 substations and 12 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
DataVita DV1Data center——4.2 km
Asanti HamiltonData center——11 km
DataVita DV2Data center——16 km
Generating Station grid connectionGrid connection21.4 MWOperating23 km
Shelloch B Wind Farm grid connectionGrid connection25 MWPlanned29 km
Patrickston Farm - PV + Battery grid connectionGrid connection15.9 MWPlanned31 km
Kippen PrimarySubstation——32 km
Killearn PrimarySubstation——32 km
Kepculloch PrimarySubstation——34 km

Operator and place

More from Bluestone Energy

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page