Power plant · Highland, Scotland, United Kingdom

Spittal Mains, Spittal - Battery Energy Storage System

Spittal Mains, Spittal - Battery Energy Storage System is a planned power plant in Highland, Scotland, United Kingdom, with 300 MW of capacity, operated by Field Spittal Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSpittal Mains, Spittal, KW1 5XRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Dec 2024 (reference ECU00005116, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorField Spittal LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity300 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.4672, -3.4237DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Scottish Government (S36), reference ECU00005116)

How it compares

Spittal Mains, Spittal - Battery Energy Storage System is the 65th-largest of 872 power plants planned, permitted or under construction in Scotland and the 220th-largest of 3,222 in the United Kingdom by capacity; its 300 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland65th of 87299,272 MW0.3%
United Kingdom220th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data483rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 49 grid connections (21 operating, 284 MW) and 19 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Mybster BESS Farm grid connectionGrid connection61.5 MWPlanned0.2 km
Spittal BESS grid connectionGrid connection56.1 MWPlanned0.2 km
Achlachan Wind grid connectionGrid connection19 MWOperating1.2 km
Mybster 2 GSPSubstation——2.3 km
Mybster 1 GSPSubstation——2.3 km
Halkirk PrimarySubstation——5.6 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom