Grid connection · Scotland, United Kingdom

Laird Solar Farm grid connection

Laird Solar Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 31.4 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLAIRD SOLAR FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Lunanhead)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLunanhead GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity31.4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date20 Dec 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.6473, -2.8725SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Laird Solar Farm grid connection is the 412th-largest of 1,192 grid connections in Scotland and the 1,314th-largest of 3,903 in the United Kingdom by capacity; its 31.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland412th of 1,19288,894 MW<0.1%
United Kingdom1,314th of 3,903446,745 MW<0.1%
All grid connections in our data4,821st of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 200 power plants (42 operating, 556 MW) and 71 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Lunanhead GSPSubstation——0.9 km
Lunanhead PrimarySubstation——0.9 km
Carseview Road - Battery Energy Storage SystemPower plant49.9 MWPermitted0.9 km
Whitehills Energy Storage FacilityPower plant49.9 MWUnder construction0.9 km
Suttieside Farm, Suttieside Road - Solar Farm & Battery StoragePower plant31 MWPermitted1.2 km
Lochside PrimarySubstation——1.5 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page