Grid connection · Scotland, United Kingdom

Haughs of Cossans House grid connection

Haughs of Cossans House grid connection is a planned grid connection in Scotland, United Kingdom, with 100 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceHAUGHS OF COSSANS HOUSE grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Lunanhead Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLunanhead Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity100 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date5 Jun 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2032 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.6338, -2.9759SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Haughs of Cossans House grid connection is the 67th-largest of 1,192 grid connections in Scotland and the 412th-largest of 3,903 in the United Kingdom by capacity; its 100 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland67th of 1,19288,894 MW0.11%
United Kingdom412th of 3,903446,745 MW<0.1%
All grid connections in our data3,100th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 203 power plants (44 operating, 786 MW) and 70 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Cossans Solar Farm - Solar FarmPower plant49.9 MWPlanned0.3 km
Cossans Solar Farm -ESSPower plant35 MWPlanned0.3 km
Dragonhall Farm, Padanaram - Battery StoragePower plant10 MWUnder construction3.4 km
Maryton PrimarySubstation——3.7 km
Lochside PrimarySubstation——5.0 km
Inverarity PrimarySubstation——6.9 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page