Grid connection · Scotland, United Kingdom

Frodo & Bilbo Farm Solar/BESS grid connection

Frodo & Bilbo Farm Solar/BESS grid connection is a planned grid connection in Scotland, United Kingdom, with 74.6 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceFRODO & BILBO FARM SOLAR/BESS grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Strichen Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toFrodo Solar and Battery Energy Development (matched by shared name+coordinates+technology+capacity, 1.61 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toStrichen Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity74.6 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date4 Nov 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Aug 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.6005, -1.8852SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Frodo & Bilbo Farm Solar/BESS grid connection is the 97th-largest of 1,192 grid connections in Scotland and the 581st-largest of 3,903 in the United Kingdom by capacity; its 74.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland97th of 1,19288,894 MW<0.1%
United Kingdom581st of 3,903446,745 MW<0.1%
All grid connections in our data3,655th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 150 power plants (50 operating, 297 MW) and 38 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Bilbo Solar Farm Energy StoragePower plant40 MWUnder construction1.2 km
Greenside Extension - Wind TurbinesPower plant7.05 MWPermitted1.4 km
Frodo Solar and Battery Energy DevelopmentPower plant60.1 MWPermitted1.6 km
St Fergus GSPSubstation——3.4 km
Mintlaw PrimarySubstation——10 km
Strichen GSPSubstation——11 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom