Grid connection · Scotland, United Kingdom

East Balmirmer Farm grid connection

East Balmirmer Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 57.5 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceEAST BALMIRMER FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connection site: ARBROATH GRID)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (ACCEPTED TO CONNECT)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toArbroath GSP (via: primary)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity57.5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date2 Jul 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2032 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.5404, -2.6827SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

East Balmirmer Farm grid connection is the 153rd-largest of 1,192 grid connections in Scotland and the 706th-largest of 3,903 in the United Kingdom by capacity; its 57.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland153rd of 1,19288,894 MW<0.1%
United Kingdom706th of 3,903446,745 MW<0.1%
All grid connections in our data3,628th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 200 power plants (44 operating, 2,161 MW) and 64 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Bonnyknox Solar FarmPower plant49.9 MWPlanned2.1 km
Corse Hill Wind FarmPower plant17.5 MWCancelled2.4 km
New Mains Of Guynd FarmPower plant10 MWOperating4.2 km
Carnoustie PrimarySubstation——4.3 km
Elliot Depot PrimarySubstation——4.4 km
Arbroath GSPSubstation——4.7 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page