Grid connection · Scotland, United Kingdom

Dupplin Solar 75MW BESS&Solar grid connection

Dupplin Solar 75MW BESS&Solar grid connection is a planned grid connection in Scotland, United Kingdom, with 75 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceDUPPLIN SOLAR 75MW BESS&SOLAR grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Burghmuir Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBurghmuir Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity75 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date10 Jan 2025SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2035 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.3586, -3.5326SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Dupplin Solar 75MW BESS&Solar grid connection is the 92nd-largest of 1,192 grid connections in Scotland and the 568th-largest of 3,903 in the United Kingdom by capacity; its 75 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland92nd of 1,19288,894 MW<0.1%
United Kingdom568th of 3,903446,745 MW<0.1%
All grid connections in our data3,617th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 294 power plants (71 operating, 1,116 MW), 66 substations and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Forteviot PrimarySubstation——1.7 km
Dupplin Solar - Solar ArrayPower plant97.5 MWPlanned3.3 km
Taigh An Struith, Tibbermore - Battery Energy StoragePower plant49.9 MWCancelled4.6 km
Burghmuir GSPSubstation——5.0 km
Burghmuir PrimarySubstation——5.0 km
Brunt Hill Wind Farm & Battery StoragePower plant130 MWPlanned5.2 km
Edinburgh SC-3Data center——48 km
Pulsant Edinburgh SC-1Data center——50 km
Pulsant Edinburgh South Gyle SC-1Data center——50 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page