Grid connection · Scotland, United Kingdom

Clachaig Glen Wind Farm grid connection

Clachaig Glen Wind Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 49.9 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCLACHAIG GLEN WIND FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Carradale Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toClachaig Glen (matched by name+coordinates+technology, 3.13 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity49.9 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date8 Apr 2025SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date8 Apr 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates55.6330, -5.6681SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Clachaig Glen (planning authority Scottish Government (S36), reference ECU00002103)
  2. Permit applied for: Clachaig Glen (planning authority Scottish Government (S36), reference ECU00002103)

How it compares

Clachaig Glen Wind Farm grid connection is the 261st-largest of 1,192 grid connections in Scotland and the 904th-largest of 3,903 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland261st of 1,19288,894 MW<0.1%
United Kingdom904th of 3,903446,745 MW<0.1%
All grid connections in our data4,270th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 61 power plants (14 operating, 229 MW) and 27 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Clachaig GlenPower plant30 MWPermitted3.1 km
Clachaig GlenPower plant60 MWPermitted3.1 km
Killean Wind FarmPower plant59.4 MWPlanned3.7 km
Ballure PrimarySubstation——6.5 km
Carradale 1 GSPSubstation——11 km
Carradale 2 GSPSubstation——11 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom