Grid connection · Scotland, United Kingdom

Cairntawie Wood Wind Farm grid connection

Cairntawie Wood Wind Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 12.6 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCAIRNTAWIE WOOD WIND FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at St Fergus Gas Term)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity12.6 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date28 Aug 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.5631, -1.9579SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Cairntawie Wood Wind Farm grid connection is the 650th-largest of 1,192 grid connections in Scotland and the 1,994th-largest of 3,903 in the United Kingdom by capacity; its 12.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland650th of 1,19288,894 MW<0.1%
United Kingdom1,994th of 3,903446,745 MW<0.1%
All grid connections in our data5,829th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 173 power plants (54 operating, 427 MW), 60 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
St Fergus Moss Wind FarmPower plant6 MWOperating3.2 km
Strichen SouthPower plant10 MWCancelled4.0 km
North Red BogPower plant1.6 MWOperating4.1 km
Mintlaw PrimarySubstation——4.3 km
St Fergus GSPSubstation——6.3 km
Strichen GSPSubstation——7.1 km
BrightsolidData center——47 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page