Grid connection · Scotland, United Kingdom

Berryhill grid connection

Berryhill grid connection is a planned grid connection in Scotland, United Kingdom, with 90 MW of capacity, connected by Scottish Hydro Electric.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBERRYHILL grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Charleston)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCharleston GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity90 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro ElectricSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date31 Jan 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.4879, -3.1117SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Berryhill grid connection is the 80th-largest of 1,192 grid connections in Scotland and the 510th-largest of 3,903 in the United Kingdom by capacity; its 90 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland80th of 1,19288,894 MW0.1%
United Kingdom510th of 3,903446,745 MW<0.1%
All grid connections in our data3,422nd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 262 power plants (57 operating, 934 MW) and 72 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy StoragePower plant49.9 MWPermitted2.9 km
Gourdie PrimarySubstation——3.2 km
Pyotdykes Farm, Stoneygroves, Liff - Solar FarmPower plant28 MWPermitted3.4 km
Dykes Of Gray Road - Solar PV ArrayPower plant2 MWCancelled3.8 km
Charleston GSPSubstation——4.3 km
Charleston PrimarySubstation——4.4 km