Power plant · Angus, Scotland, United Kingdom

Pyotdykes Farm, Stoneygroves, Liff - Solar Farm

Pyotdykes Farm, Stoneygroves, Liff - Solar Farm is a permitted power plant in Angus, Scotland, United Kingdom, with 28 MW of capacity, operated by Sonnedix Weston Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAngus (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address500M East Of Stoneygroves Liff, DD2 5QQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 Mar 2024 (permit 23/00756/FULM, Town and Country Planning Act, issued by Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Oct 2023 (reference 23/00756/FULM, planning authority Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Mar 2024 (granted, reference 23/00756/FULM, planning authority Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSonnedix Weston LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity28 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area30 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.4908, -3.0568DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Pyotdykes Farm, Stoneygroves, Liff - Solar Farm is the 534th-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,692nd-largest of 3,222 in the United Kingdom by capacity; its 28 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland534th of 87299,272 MW<0.1%
United Kingdom1,692nd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,173rd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 92 grid connections (26 operating, 392 MW) and 69 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Charleston Solar 20MW PV grid connectionGrid connection20 MWPlanned1.0 km
Gourdie PrimarySubstation——1.6 km
Charleston GSPSubstation——1.9 km
Charleston PrimarySubstation——2.0 km
49.9MW Battery Storage grid connectionGrid connection49.9 MWPlanned2.1 km
West Gourdie BESS grid connectionGrid connection47.4 MWOperating2.2 km