Grid connection · Scotland, United Kingdom

Auchencarroch Energy Ltd grid connection

Auchencarroch Energy Ltd grid connection is a grid connection in Scotland, United Kingdom, with 3.04 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceAUCHENCARROCH ENERGY LTD grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Auchencarroch)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toStrathleven GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity3.04 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyLandfill gasSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates55.9927, -4.5696SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Auchencarroch Energy Ltd grid connection is the 937th-largest of 1,192 grid connections in Scotland and the 3,063rd-largest of 3,903 in the United Kingdom by capacity; its 3.04 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland937th of 1,19288,894 MW<0.1%
United Kingdom3,063rd of 3,903446,745 MW<0.1%
All grid connections in our data6,748th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 309 power plants (80 operating, 1,699 MW) and 35 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Auchencarroch LandfillPower plant2.1 MWOperating2.5 km
Auchencarroch Landfill ExtensionPower plant2 MWOperating2.5 km
Merkins Wind FarmPower plant25 MWCancelled2.8 km
Strathleven GSPSubstation——3.6 km
Blairlinnans PrimarySubstation——4.5 km
Dumfin 11kV NetworkSubstation——7.3 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page