Grid connection · Scotland, United Kingdom

Add CAP for FEF201, 1MW Export, 1MW Import grid connection

Add CAP for FEF201, 1MW Export, 1MW Import grid connection is a planned grid connection in Scotland, United Kingdom, with 1 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceADD CAP FOR FEF201, 1MW EXPORT, 1MW IMPORT grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Lunanhead Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLunanhead Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity1 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date22 Jul 2026SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date22 Jul 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.6289, -2.8796SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Add CAP for FEF201, 1MW Export, 1MW Import grid connection is the 1,178th-largest of 1,192 grid connections in Scotland and the 3,835th-largest of 3,903 in the United Kingdom by capacity; its 1 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland1,178th of 1,19288,894 MW<0.1%
United Kingdom3,835th of 3,903446,745 MW<0.1%
All grid connections in our data7,851st of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 206 power plants (44 operating, 571 MW) and 70 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Craignathro Farm - Solar ArrayPower plant6.5 MWPermitted0.3 km
Craignathro Farm - Solar ArrayPower plant6 MWPermitted0.3 km
Lochside PrimarySubstation——1.9 km
Newfordpark House, Glamis Road - Solar PanelsPower plant6.68 MWPermitted2.1 km
Lunanhead GSPSubstation——2.9 km
Lunanhead PrimarySubstation——3.0 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page