Grid connection · Scotland, United Kingdom
20MW grid connection
20MW grid connection is a planned grid connection in Scotland, United Kingdom, with 25.1 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland (connection site: LYNDHURST GRID) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (ACCEPTED TO CONNECT) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Lyndhurst Primary (via: primary) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 25.1 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 20 Mar 2023 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 31 Oct 2031 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 56.4797, -3.0022 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its grid operator? Ask us.
How it compares
20MW grid connection is the 614th-largest of 1,518 grid connections in Scotland and the 1,652nd-largest of 4,493 in the United Kingdom by capacity; its 25.1 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 614th of 1,518 | 96,638 MW | <0.1% |
| United Kingdom | 1,652nd of 4,493 | 459,551 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 68 substations, measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Lyndhurst GSP | Substation | — | — | 0.9 km |
| Lyndhurst Primary | Substation | — | — | 0.9 km |
| Lochee Primary | Substation | — | — | 1.0 km |
Grid operator and place
More from Scottish Hydro Electric Power Distribution plc
- 60MW PV/Wind/BESS grid connection180 MW
- Wester Covesea Solar, Wind and Storage grid connection180 MW
- Sloy Power Station grid connection160 MW
- Seggiecrook Farm BESS and Solar grid connection126 MW
- Ledyatt Farm grid connection124 MW
- Balgonie Farm grid connection120 MW
- Fragland grid connection120 MW
- Jamesfield Farm grid connection120 MW
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.