Power plant · Dundee City, Scotland, United Kingdom

Grange Of Berryhill - Solar Farm

Grange Of Berryhill - Solar Farm is a permitted power plant in Dundee City, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Uniper UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDundee City (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressField 300M West Of Grange Of Berryhill Invergowrie, DD2 4DGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date21 Sept 2022 (permit 21/00535/FULM, Town and Country Planning Act, issued by Dundee City)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Jul 2021 (reference 21/00535/FULM, planning authority Dundee City)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Sept 2022 (appeal granted, reference 21/00535/FULM, planning authority Dundee City)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Feb 2022 (refused, reference 21/00535/FULM, planning authority Dundee City)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Sept 2022 (granted, reference 21/00535/FULM, planning authority Dundee City)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorUniper UK LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area119 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.4715, -3.0241DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Grange Of Berryhill - Solar Farm is the 320th-largest of 872 power plants planned, permitted or under construction in Scotland and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland320th of 87299,272 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 92 grid connections (26 operating, 392 MW) and 69 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Lochee PrimarySubstation——1.1 km
Lyndhurst PrimarySubstation——1.1 km
Lyndhurst GSPSubstation——1.1 km
Dunsinane Battery grid connectionGrid connection47.4 MWOperating1.3 km
20MW grid connectionGrid connection25.1 MWPlanned1.6 km
West Gourdie BESS grid connectionGrid connection47.4 MWOperating1.9 km

Operator and place

More from Uniper UK Limited

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page