Westhampnett Solar Farm grid connection is a grid connection in England, United Kingdom, with 6.65 MW of capacity, held by West Sussex County Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceWESTHAMPNETT SOLAR FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Westhampnett PV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderWest Sussex County CouncilSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toFormer Westhampnett Landfill (matched by shared name+coordinates+technology+capacity+company, 0.44 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toChichester BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity6.65 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.8480, -0.7465SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Former Westhampnett Landfill
  2. Permit granted: Former Westhampnett Landfill (planning authority Chichester, reference WSCC/057/16/WH)
  3. Permit applied for: Former Westhampnett Landfill (planning authority Chichester, reference WSCC/057/16/WH)

How it compares

Westhampnett Solar Farm grid connection is the 1,535th-largest of 2,533 grid connections in England and the 2,408th-largest of 3,903 in the United Kingdom by capacity; its 6.65 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,535th of 2,533319,370 MW<0.1%
United Kingdom2,408th of 3,903446,745 MW<0.1%
All grid connections in our data6,351st of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 199 power plants (87 operating, 2,460 MW), 130 substations, 13 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Former Westhampnett LandfillPower plant7.5 MWOperating0.4 km
Strettington Solar FarmPower plant5 MWOperating1.7 km
Market PrimarySubstation——2.3 km
Chichester Food Park, Runcton Unit - Solar PanelsPower plant1.33 MWPermitted3.1 km
Hunston PrimarySubstation——3.8 km
Hunston BSPSubstation——3.8 km
SSE data center, HavantData center——16 km
Aquind InterconnectorTransmission line—Planned22 km
ServerHouseData center——29 km

Holder, grid operator and place

More from West Sussex County Council

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page