Power plant · Chichester, England, United Kingdom

Chichester Food Park, Runcton Unit - Solar Panels

Chichester Food Park, Runcton Unit - Solar Panels is a permitted power plant in Chichester, England, United Kingdom, with 1.33 MW of capacity, operated by Landlink Estates Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationChichester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressChichester Food Park, Runcton Unit, Bognor Road, Chichester, PO20 1NWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date8 Jul 2024 (permit 24/01127/PA14J, Town and Country Planning Act, issued by Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 May 2024 (reference 24/01127/PA14J, planning authority Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jul 2024 (granted, reference 24/01127/PA14J, planning authority Chichester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLandlink Estates LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.33 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8208, -0.7385DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Chichester, reference 24/01127/PA14J)
  2. Permit applied for (planning authority Chichester, reference 24/01127/PA14J)

How it compares

Chichester Food Park, Runcton Unit - Solar Panels is the 1,972nd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,971st-largest of 3,222 in the United Kingdom by capacity; its 1.33 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,972nd of 2,174185,888 MW<0.1%
United Kingdom2,971st of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,196th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 127 grid connections (75 operating, 707 MW), 119 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Merston Farm grid connectionGrid connection1.8 MWPlanned0.7 km
Generation 4.75 MW grid connection at Rose GreenGrid connection4.75 MWOperating1.1 km
Merston Farm PV - 1 grid connectionGrid connection3.8 MWOperating1.7 km
Hunston BSPSubstation——2.1 km
Hunston PrimarySubstation——2.1 km
Market PrimarySubstation——3.0 km
SSE data center, HavantData center——17 km
Aquind InterconnectorTransmission line—Planned24 km
ServerHouseData center——30 km

Operator and place

More from Landlink Estates Limited

Other power plants in England

All 5809 power plants in England, United Kingdom