Waste 3.7 MW grid connection at Sunbury Cross
Waste 3.7 MW grid connection at Sunbury Cross is a grid connection in England, United Kingdom, with 3.7 MW of capacity, held by SUEZ Recycling and Recovery UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | Waste 3.7 MW grid connection at SUNBURY CROSS | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Sunbury Cross) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | SUEZ Recycling and Recovery UK Limited | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Sunbury Cross Primary (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Charlton Lane Eco Park (ACT) (matched by coordinates+technology+capacity, 0.26 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 3.7 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Waste | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 4 Jul 2016 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.4051, -0.4414 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Construction started: Charlton Lane Eco Park (ACT)
- Permit granted: Charlton Lane Eco Park (ACT) (planning authority Spelthorne, reference 10/00947/SCC)
- Permit applied for: Charlton Lane Eco Park (ACT) (planning authority Spelthorne, reference 10/00947/SCC)
How it compares
Waste 3.7 MW grid connection at Sunbury Cross is the 1,922nd-largest of 2,533 grid connections in England and the 2,964th-largest of 3,903 in the United Kingdom by capacity; its 3.7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,922nd of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 2,964th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 6,956th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 295 power plants (94 operating, 768 MW), 185 substations, 156 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Charlton Lane Eco Park (ACT) | Power plant | 3.6 MW | Under construction | 0.3 km |
| Charlton Lane Eco Park (Waste AD) | Power plant | 1.7 MW | Operating | 0.3 km |
| Sunbury Battery Energy Storage System - Battery Energy Storage System | Power plant | 200 MW | Permitted | 0.6 km |
| Sunbury Cross Primary | Substation | — | — | 2.1 km |
| Laleham GSP | Substation | — | — | 2.9 km |
| Church Road Primary | Substation | — | — | 3.6 km |
| Serverfarm LON1 – London Data Center | Data center | — | — | 4.7 km |
| Verizon UK4 | Data center | — | — | 6.4 km |
| Redcentric Byfleet | Data center | — | — | 6.9 km |
Holder, grid operator and place
More from SUEZ Recycling and Recovery UK Limited
- Generation 1.7 MW grid connection at Sunbury Cross1.7 MW
- Waste 1.398 MW grid connection at Eastleigh North1.4 MW
- Waste 1.235 MW grid connection at Tongham1.24 MW
- Seghill Household Waste Recovery Centre -Solar Panels5.8 MW · planned
- Seghill Household Waste Recovery Centre - Solar Panels5.8 MW · planned
- Brixworth Landfill, Scaldwell Road - Solar Array & Battery Storage5.6 MW · planned
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.