Waste 1.398 MW grid connection at Eastleigh North is a grid connection in England, United Kingdom, with 1.4 MW of capacity, held by SUEZ Recycling and Recovery UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | Waste 1.398 MW grid connection at EASTLEIGH NORTH | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Eastleigh North) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | SUEZ Recycling and Recovery UK Limited | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Eastleigh North Primary (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 1.4 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Waste | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.9677, -1.2782 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Waste 1.398 MW grid connection at Eastleigh North is the 2,355th-largest of 2,533 grid connections in England and the 3,650th-largest of 3,903 in the United Kingdom by capacity; its 1.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,355th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 3,650th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,354th of 7,616 | 1,281,251 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 274 power plants (120 operating, 1,131 MW), 210 substations, 12 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Fairoak Landfill | Power plant | 1.5 MW | Operating | 0.5 km |
| Allington Lane - Solar & Battery Farm | Power plant | 27 MW | Permitted | 1.7 km |
| Allington Lane - Solar & Battery Farm | Power plant | 16 MW | Permitted | 1.7 km |
| Hedge End Primary | Substation | — | — | 3.7 km |
| Bishopstoke Primary | Substation | — | — | 4.3 km |
| Eastleigh North Primary | Substation | — | — | 5.3 km |
| Regit4u | Data center | — | — | 7.1 km |
| Sky Chilworth | Data center | — | — | 10 km |
| SCC | Data center | — | — | 11 km |
Holder, grid operator and place
More from SUEZ Recycling and Recovery UK Limited
- Waste 3.7 MW grid connection at Sunbury Cross3.7 MW
- Generation 1.7 MW grid connection at Sunbury Cross1.7 MW
- Waste 1.235 MW grid connection at Tongham1.24 MW
- Seghill Household Waste Recovery Centre -Solar Panels5.8 MW · planned
- Seghill Household Waste Recovery Centre - Solar Panels5.8 MW · planned
- Brixworth Landfill, Scaldwell Road - Solar Array & Battery Storage5.6 MW · planned
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.