Grid connection · England, United Kingdom

Waste 1.398 MW grid connection at Eastleigh North

Waste 1.398 MW grid connection at Eastleigh North is a grid connection in England, United Kingdom, with 1.4 MW of capacity, held by SUEZ Recycling and Recovery UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceWaste 1.398 MW grid connection at EASTLEIGH NORTHSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Eastleigh North)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderSUEZ Recycling and Recovery UK LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toEastleigh North Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity1.4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWasteSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.9677, -1.2782SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Waste 1.398 MW grid connection at Eastleigh North is the 2,355th-largest of 2,533 grid connections in England and the 3,650th-largest of 3,903 in the United Kingdom by capacity; its 1.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,355th of 2,533319,370 MW<0.1%
United Kingdom3,650th of 3,903446,745 MW<0.1%
All grid connections in our data7,354th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 274 power plants (120 operating, 1,131 MW), 210 substations, 12 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fairoak LandfillPower plant1.5 MWOperating0.5 km
Allington Lane - Solar & Battery FarmPower plant27 MWPermitted1.7 km
Allington Lane - Solar & Battery FarmPower plant16 MWPermitted1.7 km
Hedge End PrimarySubstation——3.7 km
Bishopstoke PrimarySubstation——4.3 km
Eastleigh North PrimarySubstation——5.3 km
Regit4uData center——7.1 km
Sky ChilworthData center——10 km
SCCData center——11 km

Holder, grid operator and place

More from SUEZ Recycling and Recovery UK Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page