Grid connection · England, United Kingdom
Waste 1.235 MW grid connection at Tongham
Waste 1.235 MW grid connection at Tongham is a grid connection in England, United Kingdom, with 1.24 MW of capacity, held by SUEZ Recycling and Recovery UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | Waste 1.235 MW grid connection at TONGHAM | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connection site: TONGHAM) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (CONNECTED) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | SUEZ Recycling and Recovery UK Limited | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Tongham Primary (via: primary) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 1.24 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Waste | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.2230, -0.7189 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Waste 1.235 MW grid connection at Tongham is the 2,399th-largest of 2,533 grid connections in England and the 3,708th-largest of 3,903 in the United Kingdom by capacity; its 1.24 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,399th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 3,708th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,412th of 7,616 | 1,281,251 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 272 power plants (100 operating, 737 MW), 233 substations, 1 transmission line and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tongham Primary | Substation | — | — | 2.0 km |
| Runfold Landfill | Power plant | 1.2 MW | Operating | 2.9 km |
| Aldershot Primary | Substation | — | — | 3.7 km |
| Aldershot BSP | Substation | — | — | 3.7 km |
| Farnborough International Exhibition Centre, Etps Road - Solar Panels | Power plant | 1.15 MW | Under construction | 6.7 km |
| University of Surrey, Blackwell Farm - Solar Farm | Power plant | 12.1 MW | Permitted | 6.9 km |
| Aquind Interconnector | Transmission line | — | Planned | 41 km |
| SDC M40 Campus | Data center | — | Planned | 41 km |
Holder, grid operator and place
More from SUEZ Recycling and Recovery UK Limited
- Waste 3.7 MW grid connection at Sunbury Cross3.7 MW
- Generation 1.7 MW grid connection at Sunbury Cross1.7 MW
- Waste 1.398 MW grid connection at Eastleigh North1.4 MW
- Seghill Household Waste Recovery Centre -Solar Panels5.8 MW · planned
- Seghill Household Waste Recovery Centre - Solar Panels5.8 MW · planned
- Brixworth Landfill, Scaldwell Road - Solar Array & Battery Storage5.6 MW · planned
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- CAISO queue report. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, No restriction on the posted data.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, No restriction on the posted data.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.