Power plant · West Lothian, Scotland, United Kingdom

Tesco Distribution Centre (Livingston) Power Station

Tesco Distribution Centre (Livingston) Power Station is a cancelled biomass power plant in West Lothian, Scotland, United Kingdom, with 6.5 MW of capacity, operated by Tesco.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Lothian (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCarnegie Road, Deans Industrial Estate, Livingston, EH54 8TBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date8 Dec 2010 (permit 0467/FUL/10, Town and Country Planning Act, issued by West Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Jun 2010 (reference 0467/FUL/10, planning authority West Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Dec 2010 (granted, reference 0467/FUL/10, planning authority West Lothian)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTesco (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.9055, -3.5812DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority West Lothian, reference 0467/FUL/10)
  2. Permit applied for (planning authority West Lothian, reference 0467/FUL/10)

How it compares

Tesco Distribution Centre (Livingston) is the 819th-largest of 1,342 power plants in Scotland and the 3,009th-largest of 5,837 in the United Kingdom by capacity; its 6.5 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland819th of 1,34246,828 MW<0.1%
United Kingdom3,009th of 5,837200,833 MW<0.1%
All power plants in our data8,746th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 20 grid connections (7 operating, 67.6 MW), 14 data centers and 7 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Sungard Availability ServicesData center——7.0 km
Edinburgh SC-3Data center——11 km
Edinburgh SC-2Data center——18 km
Glendevon PrimarySubstation——34 km
Milnathort PrimarySubstation——37 km
Generating Station grid connectionGrid connection21.4 MWOperating38 km
Dunblane PrimarySubstation——40 km
Windburn Wind Farm 75MW Wind, 35MW BESS grid connectionGrid connection110 MWPlanned40 km
Patrickston Farm - PV + Battery grid connectionGrid connection15.9 MWPlanned41 km