Power plant · East Riding of Yorkshire, England, United Kingdom

Tesco Distribution Centre, Goole

Tesco Distribution Centre, Goole is a cancelled power plant in East Riding of Yorkshire, England, United Kingdom, with 5 MW of capacity, operated by Tesco.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Riding of Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTesco Distribution Centre, Capitol Park, Rawcliffee Road, Goole, DN14 6XLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Jul 2008 (permit 11/02623/STPLFE, Town and Country Planning Act, issued by East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Aug 2007 (reference 11/02623/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Jul 2008 (granted, reference 11/02623/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTescoDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7056, -0.8967DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority East Riding of Yorkshire, reference 11/02623/STPLFE)
  2. Permit applied for (planning authority East Riding of Yorkshire, reference 11/02623/STPLFE)

How it compares

Tesco Distribution Centre, Goole is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,758th of 3,43071,965 MW<0.1%
United Kingdom2,742nd of 5,050115,622 MW<0.1%
All power plants in our data8,380th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 462 grid connections (230 operating, 2,877 MW), 291 substations, 5 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
GooleSubstation——0.9 km
Gas 5.16 MW grid connection at Glassworks 1_2Grid connection5.16 MWOperating0.9 km
Guardian GlassSubstation——1.5 km
Solar 1 MW grid connection at GooleGrid connection1 MWOperating2.1 km
Solar 1.147 MW grid connection at GooleGrid connection1.15 MWOperating2.1 km
RawcliffeSubstation——4.1 km
ThalesData center——27 km
North Humber to High MarnhamTransmission line—Planned28 km
HSBC Wakefield Data CentreData center——32 km

Operator and place

More from Tesco

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page