Grid connection · England, United Kingdom
The Woodyard grid connection
The Woodyard grid connection is a grid connection in England, United Kingdom, with 7.5 MW of capacity, held by Roadnight Taylor Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Longfield 11kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Roadnight Taylor Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Longfield 11kV (via a primary substation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Capacity | 7.5 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Gas | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 21 Aug 2018 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.4067, 0.2987 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
How it compares
The Woodyard grid connection is the 2,033rd-largest of 3,539 grid connections in England and the 2,856th-largest of 4,870 in the United Kingdom by capacity; its 7.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,033rd of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 2,856th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,524th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 487 substations, 328 power plants (130 operating, 8,034 MW), 84 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Longfield 11kV | Substation | — | — | 0.9 km |
| Dartford BESS - Battery Energy Storage System | Power plant | 300 MW | Cancelled | 2.0 km |
| New Barn Road - Battery Energy Storage Facility | Power plant | 35 MW | Permitted | 2.0 km |
| Broadditch Battery Energy | Power plant | 11 MW | Operating | 2.4 km |
| Northfleet East 33kV | Substation | — | — | 3.2 km |
| Ebbsfleet 11KV | Substation | — | — | 3.8 km |
| CustodianDC DA2 | Data center | — | — | 5.9 km |
| Fujitsu Data Centre | Data center | — | — | 8.5 km |
| OVH data center, England | Data center | — | — | 13 km |
Holder, grid operator and place
More from Roadnight Taylor Limited
- 99.9MW BESS grid connection111 MW
- Roosecote LDES Power Station grid connection50 MW
- Tilbury Farm grid connection49.9 MW
- Perwinnes grid connection48 MW
- Phs 2 Millfield Lane grid connection20 MW
- Ducklington Solar grid connection18 MW
- Newington Solar Plant grid connection13.7 MW
- Welsh Way - Solar PV grid connection11 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.