Data center · England, United Kingdom

Pulsant Milton Keynes SE-1

Pulsant Milton Keynes SE-1 is a data center in England, United Kingdom, operated by Pulsant.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Address5 Rockingham Drive, Milton KeynesOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorPulsantOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Websitehttps://www.pulsant.com/colocation-milton-keynes-datacentreOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint2,208 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.0551, -0.7554OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

Pulsant operates 8 of the 191 data centers in the United Kingdom in our data with a named owner; 3 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%

Nearby

Within 50 km of this data center: 442 power plants (155 operating, 1,598 MW), 44 grid connections (18 operating, 175 MW) and 41 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Mercedes Benz UK - Solar array car portPower plant2 MWPermitted2.1 km
Pineham AD Plant (Waste AD)Power plant1 MWCancelled3.5 km
Milton Keynes Waste Recovery ParkPower plant7 MWOperating4.1 km
East Claydon GSPSubstation——18 km
Pembridge Farm grid connectionGrid connection131 MWPlanned25 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating27 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned28 km
Cottisford PrimarySubstation——28 km
Bicester North BSPSubstation——31 km