Power plant · Wokingham, England, United Kingdom

Aborfield Solar Park

Aborfield Solar Park is a solar power plant under construction in Wokingham, England, United Kingdom, with 14 MW of capacity, operated by Wessex Solar Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWokingham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBartletts Farm, Swallowfield Road, Arborfield, Reading, RG2 9JXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date12 Mar 2021 (permit 200711, Town and Country Planning Act, issued by Wokingham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Mar 2020 (reference 200711, planning authority Wokingham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Mar 2021 (granted, reference 200711, planning authority Wokingham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWessex Solar EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area19.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3862, -0.9184DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Wokingham, reference 200711)
  3. Permit applied for (planning authority Wokingham, reference 200711)

How it compares

Aborfield Solar Park is the 1,111th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,792nd-largest of 2,548 in the United Kingdom by capacity; its 14 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,111th of 1,650171,264 MW<0.1%
United Kingdom1,792nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,249th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 246 substations, 180 grid connections (92 operating, 1,035 MW) and 96 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Arborfield PV grid connectionGrid connection14 MWOperating0.4 km
Arborfield PrimarySubstation——0.6 km
Sheepbridge Court Farm grid connectionGrid connection3.88 MWOperating3.3 km
Sheepbridge Court Farm Cottages grid connectionGrid connection19 MWPlanned3.3 km
Wokingham BSPSubstation——4.6 km
Wokingham PrimarySubstation——4.6 km
Redcentric ReadingData center——5.5 km
Asanti - ReadingData center——5.7 km
CSquare London LHR3Data center——6.1 km

Operator and place

More from Wessex Solar Energy

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page