Grid connection · England, United Kingdom

Penn Croft Farm BESS grid connection

Penn Croft Farm BESS grid connection is a planned grid connection in England, United Kingdom, with 100 MW of capacity, held by RE Projects Development.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourcePENN CROFT FARM BESS grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Coxmoor Wood)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderRE Projects DevelopmentSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCoxmoor Wood BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toPenn Croft Farm, Crondall - Battery Energy Storage Facility (matched by shared name+coordinates+technology+capacity, 0.84 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity100 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date17 Sept 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Oct 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.2331, -0.8780SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Penn Croft Farm, Crondall - Battery Energy Storage Facility (planning authority Hart, reference 21/02937/FUL)
  2. Permit applied for: Penn Croft Farm, Crondall - Battery Energy Storage Facility (planning authority Hart, reference 21/02937/FUL)

How it compares

Penn Croft Farm BESS grid connection is the 311th-largest of 2,533 grid connections in England and the 412th-largest of 3,903 in the United Kingdom by capacity; its 100 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England311th of 2,533319,370 MW<0.1%
United Kingdom412th of 3,903446,745 MW<0.1%
All grid connections in our data3,100th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 279 power plants (109 operating, 947 MW), 256 substations, 90 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Penn Croft Farm, Crondall - Battery Energy Storage FacilityPower plant100 MWPermitted0.8 km
Bowenhurst Farm, Mill Lane - Battery Energy StoragePower plant100 MWCancelled1.6 km
Rye CommonPower plant49.5 MWPermitted1.7 km
Fleet-Bramley GSPSubstation——1.9 km
Coxmoor Wood PrimarySubstation——2.0 km
Coxmoor Wood BSPSubstation——2.0 km
Data center, England (OSM way 1164817477)Data center——7.7 km
Datum Farnborough Data CentreData center——7.8 km
Ark Data Centres data center, EnglandData center——7.8 km

Holder, grid operator and place

More from RE Projects Development

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page