Power plant · Hart, England, United Kingdom
Rye Common
Rye Common is a permitted power plant in Hart, England, United Kingdom, with 49.5 MW of capacity, operated by Pulse Clean Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Hart (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Street Record, Rye Common Lane, Crondall, Farnham, GU10 5DD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (appeal granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 28 Sept 2021 (permit 20/00651/FUL, Town and Country Planning Act, issued by Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 12 Mar 2020 (reference 20/00651/FUL, planning authority Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Sept 2021 (appeal granted, reference 20/00651/FUL, planning authority Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 1 May 2020 (refused, reference 20/00651/FUL, planning authority Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Sept 2021 (granted, reference 20/00651/FUL, planning authority Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Pulse Clean Energy Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.2484, -0.8739 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Rye Common is the 769th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,224th-largest of 3,222 in the United Kingdom by capacity; its 49.5 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 769th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,224th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,306th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 252 substations, 209 grid connections (114 operating, 1,184 MW), 96 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 105.6 MW grid connection at FLEET | Grid connection | 106 MW | Planned | 0.2 km |
| Coxmoor Wood BSP | Substation | — | — | 0.5 km |
| Coxmoor Wood Primary | Substation | — | — | 0.5 km |
| Fleet-Bramley GSP | Substation | — | — | 0.6 km |
| Generation 100 MW grid connection at Bramley (Flee) | Grid connection | 100 MW | Planned | 0.8 km |
| Eastbridge House grid connection | Grid connection | 59.5 MW | Planned | 1.4 km |
| Data center, England (OSM way 1164817477) | Data center | — | — | 6.4 km |
| Datum Farnborough Data Centre | Data center | — | — | 6.5 km |
| Ark Data Centres data center, England | Data center | — | — | 6.5 km |
Operator and place
More from Pulse Clean Energy Limited
- Pound Farm Lane - Battery Storage200 MW · planned
- Blue Bell Lodge, Rye Common Lane - Battery Storage49.5 MW · permitted
- Atherton - Battery energy storage30 MW
- Charnock Richard - Battery Storage30 MW
- Hirwaun Stor Generation - Battery Storage21.8 MW
- Plymouth Stor Generation - Battery storage20 MW · permitted
- Green Frog Power, Great Field Lane - Battery Energy Storage System20 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.