Substation · England, United Kingdom

Coxmoor Wood BSP

Coxmoor Wood BSP is a 132 kV bulk supply point in England, United Kingdom, with 20.5 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom20.5 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 45 / 90MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelBulk supply point (BSP)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromFleet-Bramley GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementAdd a 3rd 90MVA transformer (due Dec 2031)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kV (levels 132, 33 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.2512, -0.8791SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 275 power plants (107 operating, 2,586 MW), 211 grid connections (115 operating, 1,223 MW), 92 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fleet SubstationPower plant49.9 MWCancelled0.2 km
Battery storage 105.6 MW grid connection at FLEETGrid connection106 MWPlanned0.3 km
Rye CommonPower plant49.5 MWCancelled0.5 km
Blue Bell Lodge, Rye Common Lane - Battery StoragePower plant49.5 MWCancelled0.5 km
Generation 100 MW grid connection at Bramley (Flee)Grid connection100 MWPlanned1.2 km
Eastbridge House grid connectionGrid connection59.5 MWPlanned1.9 km
Data center, England (OSM way 1164817477)Data center——6.5 km
Ark Data Centres data center, EnglandData center——6.6 km
Datum Farnborough Data CentreData center——6.6 km

Grid operator and place

Substations fed from here

Grid connections attached to this substation

More from Southern Electric Power Distribution plc

Candidate sites around this substation

10 sites of land near Coxmoor Wood BSP have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page