Power plant · Hart, England, United Kingdom

Bowenhurst Farm, Mill Lane - Battery Energy Storage

Bowenhurst Farm, Mill Lane - Battery Energy Storage is a cancelled battery storage plant in Hart, England, United Kingdom, with 100 MW of capacity, operated by Bowenhurst BESS Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHart (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBowenhurst Farm & Stud, Mill Lane, Farnham, GU10 5RPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jul 2025 (reference 25/01186/FUL, planning authority Hart)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Feb 2026 (refused, reference 25/01186/FUL, planning authority Hart)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBowenhurst BESS Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2470, -0.8700DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit refused (planning authority Hart, reference 25/01186/FUL)
  2. Permit applied for (planning authority Hart, reference 25/01186/FUL)

How it compares

Bowenhurst Farm, Mill Lane - Battery Energy Storage was cancelled before it was built: it is not ranked among the power plants that run, and its 100 MW is not counted in their totals.

Nearby

Within 50 km of this power plant: 252 substations, 212 grid connections (117 operating, 1,227 MW), 96 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 105.6 MW grid connection at FLEETGrid connection106 MWPlanned0.5 km
Generation 100 MW grid connection at Bramley (Flee)Grid connection100 MWPlanned0.6 km
Coxmoor Wood BSPSubstation——0.8 km
Coxmoor Wood PrimarySubstation——0.8 km
Fleet-Bramley GSPSubstation——0.9 km
Eastbridge House grid connectionGrid connection59.5 MWPlanned1.1 km
Data center, England (OSM way 1164817477)Data center——6.3 km
Datum Farnborough Data CentreData center——6.4 km
Ark Data Centres data center, EnglandData center——6.4 km

Operator and place

Grid connections attached to this power plant

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page