Power plant · South Oxfordshire, England, United Kingdom
Langley Hall Farm
Langley Hall Farm is a power plant in South Oxfordshire, England, United Kingdom, with 2.4 MW of capacity, operated by Lark Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Oxfordshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Field part of Langley Hall Farm between Chalgrove and Newington | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2014 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 27 Sept 2013 (permit P13/S1885/FUL, Town and Country Planning Act, issued by South Oxfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 Jul 2013 (reference P13/S1885/FUL, planning authority South Oxfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 27 Sept 2013 (granted, reference P13/S1885/FUL, planning authority South Oxfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Lark Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.4 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6637, -1.0948 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Langley Hall Farm is the 2,708th-largest of 3,430 power plants in England and the 4,001st-largest of 5,050 in the United Kingdom by capacity; its 2.4 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,708th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,001st of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 10,092nd of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. P13/S1885/FUL
- Started operating
Nearby
Within 50 km of this power plant: 250 grid connections (99 operating, 1,081 MW), 217 substations and 81 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Chalgrove grid connection | Grid connection | 2 MW | Operating | 0.6 km |
| Newington Solar Plant grid connection | Grid connection | 13.7 MW | Planned | 2.4 km |
| Nixey Farm PV grid connection | Grid connection | 16.2 MW | Operating | 3.5 km |
| Berinsfield Primary | Substation | — | — | 4.4 km |
| Watlington Primary | Substation | — | — | 6.7 km |
| Wallingford Primary | Substation | — | — | 7.6 km |
| AWS Didcot Data Centre | Data center | — | — | 13 km |
| University Shared Data Centre | Data center | — | — | 15 km |
| Data center, England (OSM way 1460602301) | Data center | — | Under construction | 18 km |
Operator and place
More from Lark Energy
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.