Power plant · Somerset, England, United Kingdom
Landmark Farm, Burts Hill To Nunney Catch Roundabout - Wind Turbine
Landmark Farm, Burts Hill To Nunney Catch Roundabout - Wind Turbine is a planned power plant in Somerset, England, United Kingdom, with 2 MW of capacity, operated by Distgen Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Somerset (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Electricity Generating Station At Landmark Farm, Burts Hill To Nunney Catch Roundabout, Wanstrow, Shepton Mallet, BA4 4TQ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Nov 2024 (reference 2024/1931/FUL, planning authority Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Distgen Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 1 units (2 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.1782, -2.4051 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Landmark Farm, Burts Hill To Nunney Catch Roundabout - Wind Turbine is the 1,849th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,806th-largest of 3,222 in the United Kingdom by capacity; its 2 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,849th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,806th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 6,008th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 328 grid connections (84 operating, 824 MW), 77 substations, 5 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Landmark Farm grid connection | Grid connection | 5.5 MW | Planned | 0.2 km |
| Holwell PV grid connection | Grid connection | 3.55 MW | Operating | 1.9 km |
| Holwell Primary | Substation | — | — | 2.5 km |
| Monksham Solar Park grid connection | Grid connection | 7.6 MW | Operating | 5.4 km |
| Bruton Primary | Substation | — | — | 7.5 km |
| Frome BSP | Substation | — | — | 9.1 km |
| Data center, England (OSM way 996865179) | Data center | — | — | 30 km |
| Ark Data Centres | Data center | — | — | 30 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 31 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.