Grid connection · England, United Kingdom

Ready - 200MW Battery grid connection

Ready - 200MW Battery grid connection is a planned grid connection in England, United Kingdom, with 200 MW of capacity, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceREADY - 200MW BATTERY grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connection site: LALEHAM)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (ACCEPTED TO CONNECT)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLaleham GSP (via: primary)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity200 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date10 Dec 2021SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date28 Feb 2031 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.4034, -0.4411SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Ready - 200MW Battery grid connection is the 235th-largest of 2,533 grid connections in England and the 318th-largest of 3,903 in the United Kingdom by capacity; its 200 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England235th of 2,533319,370 MW<0.1%
United Kingdom318th of 3,903446,745 MW<0.1%
All grid connections in our data1,776th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 296 power plants (94 operating, 768 MW), 185 substations, 1 data center and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Charlton Lane Eco Park (ACT)Power plant3.6 MWUnder construction0.3 km
Charlton Lane Eco Park (Waste AD)Power plant1.7 MWOperating0.3 km
Sunbury Battery Energy Storage System - Battery Energy Storage SystemPower plant200 MWPermitted0.7 km
Sunbury Cross PrimarySubstation——2.3 km
Laleham GSPSubstation——3.1 km
Church Road PrimarySubstation——3.8 km
SDC M40 CampusData center—Planned23 km
North London (Electricity Line) ReinforcementTransmission line—Permitted35 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom