Power plant · Gateshead, England, United Kingdom
Newburn Bridge Road - Battery Storage Facility
Newburn Bridge Road - Battery Storage Facility is a permitted power plant in Gateshead, England, United Kingdom, with 100 MW of capacity, operated by The Renewables Infrastructure Group Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Gateshead (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne, NE21 4NT | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 31 Mar 2022 (permit DC/21/00922/FUL, Town and Country Planning Act, issued by Gateshead) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 16 Aug 2021 (ref. DC/21/00922/FUL, Gateshead) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 31 Mar 2022 (granted, ref. DC/21/00922/FUL, Gateshead) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | The Renewables Infrastructure Group Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 100 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.9764, -1.7375 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Newburn Bridge Road - Battery Storage Facility is the 248th-largest of 2,174 power plants planned, permitted or under construction in England and the 426th-largest of 3,222 in the United Kingdom by capacity; its 100 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 248th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 426th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,276th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 225 grid connections (108 operating, 1,269 MW) and 136 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 99.8 MW grid connection at Newcastle BESS Direct | Grid connection | 99.8 MW | Planned | 0.1 km |
| Stella South | Substation | — | — | 0.4 km |
| Battery storage 80 MW grid connection at Newburn Bridge BESS Direct | Grid connection | 80 MW | Planned | 0.6 km |
| Battery storage 96.24 MW grid connection at Old Neolith Building BESS Direct | Grid connection | 96.2 MW | Planned | 0.7 km |
| Stella North | Substation | — | — | 0.9 km |
| Newburn Haugh Direct | Substation | — | — | 1.4 km |
Operator and place
Grid connections attached to this power plant
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.