Grid connection · England, United Kingdom

Battery storage 60 MW grid connection at Redcote Lane Direct

Battery storage 60 MW grid connection at Redcote Lane Direct is a planned grid connection in England, United Kingdom, with 60 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Redcote Lane Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toRedcote Lane, Armley - Battery Storage Facility (matched by coordinates+technology+capacity, 0.12 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toKirkstall B (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity60 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date7 Jul 2021Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.8075, -1.5874Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Redcote Lane, Armley - Battery Storage Facility (planning authority Leeds, reference 22/05849/FU)
  2. Permit applied for: Redcote Lane, Armley - Battery Storage Facility (planning authority Leeds, reference 22/05849/FU)

How it compares

Battery storage 60 MW grid connection at Redcote Lane Direct is the 488th-largest of 2,533 grid connections in England and the 672nd-largest of 3,903 in the United Kingdom by capacity; its 60 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England488th of 2,533319,370 MW<0.1%
United Kingdom672nd of 3,903446,745 MW<0.1%
All grid connections in our data3,824th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 416 substations, 392 power plants (108 operating, 3,914 MW), 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Redcote Lane, Armley - Battery Storage FacilityPower plant60 MWPermitted0.1 km
Kirkstall C 2/5Substation——0.1 km
Kirkstall C/Ring Road HorsforthSubstation——0.2 km
Kirkstall BSubstation——0.7 km
GridJetData center——2.9 km
Buslingthorpe Green - Battery Energy StoragePower plant49.9 MWPermitted3.2 km
Buslingthorpe Power Station (Leeds North)Power plant2 MWOperating3.3 km
nLighten LeedsData center——17 km
HSBC Wakefield Data CentreData center——18 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom