Grid connection · England, United Kingdom

Springfield Farm grid connection

Springfield Farm grid connection is a planned grid connection in England, United Kingdom, with 240 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Bluebell Battery Bank Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toFerrybridge B (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity240 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date7 Dec 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7021, -1.1270Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Springfield Farm grid connection is the 226th-largest of 2,533 grid connections in England and the 309th-largest of 3,903 in the United Kingdom by capacity; its 240 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England226th of 2,533319,370 MW<0.1%
United Kingdom309th of 3,903446,745 MW<0.1%
All grid connections in our data1,552nd of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 473 power plants (123 operating, 4,332 MW), 379 substations, 11 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Springfield Farm, Weeland Road - Battery Energy Storage FacilityPower plant240 MWPermitted0.1 km
Springfield Farm, Hensall - Battery Energy Storage FacilityPower plant240 MWPermitted0.1 km
EggboroughSubstation——0.4 km
Eggborough Biomass Power StationPower plant10.6 MWCancelled0.9 km
PollingtonSubstation——5.0 km
BealSubstation——5.5 km
HSBC Wakefield Data CentreData center——16 km
nLighten LeedsData center——18 km
ThalesData center——22 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page