Data center · England, United Kingdom

nLighten Leeds data centre

nLighten Leeds data centre is a data centre in England, United Kingdom, with a 2,940 m² building, operated by nLighten UK Ltd. It lies 1.7 km from a 33 kV substation, has 308 MW of power plants within 10 km and is in an area of low water stress.

Power and water

The nearest substation is Featherstone, a 33 kV bulk supply point run by Northern Powergrid (Yorkshire) plc, 1.7 km away. Its network operator publishes 27.7 MVA of demand headroom and 62.9 MW of generation headroom there, and the network there is partly congested for new demand.

Power plants of 50 MW or more in operation within 10 km: 158 MW of waste-to-energy in 2 plants, the largest FM1; 150 MW of battery storage (Kirkhaw Lane - Battery Storage Energy), 308 MW in all.

Water stress here is low: withdrawals take 9.9% of the renewable water supply of its sub-basin (WRI Aqueduct 4.0, baseline, score 1 of 5).

Distances run between the points of the records. How the grid and plants nearby are found; water stress from WRI Aqueduct 4.0.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatornLighten UK LtdOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Websitehttps://www.nlighten.com/en/edge-location/leeds/OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Nearest substationFeatherstone (1.7 km away, at 33 kV, bulk supply point)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressLow (under 10%) (score 1 of 5, withdrawals 9.9% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026
Building footprint2,940 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Large generation within 10 km150 MW (battery-storage, 1 plant, nearest 8.6 km away)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Large generation within 10 km158 MW (waste, 2 plants, nearest 8.1 km away)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Coordinates53.6993, -1.3977OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

nLighten UK Ltd operates 3 of the 191 data centers in the United Kingdom in our data with a named owner; 12 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix1st136.8%
Digital Realty Trust2nd115.8%
Virtus3rd105.2%
Pulsant4th84.2%
NTT, Inc.5th63.1%
nLighten UK Ltd13th31.6%

Nearby

Within 50 km of this data center: 427 grid connections (215 operating, 2,333 MW), 421 power plants (121 operating, 9,311 MW), 390 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 1.5 MW grid connection at SharlstonGrid connection1.5 MWOperating0.1 km
Cooksland Farm, Old Snydale -Battery Energy StoragePower plant50 MWPermitted0.8 km
Battery storage 50 MW grid connection at Cooklands Farm DirectGrid connection50 MWPlanned1.0 km
Battery storage 70 MW grid connection at Sunny Dairy Farm Energy Park DirectGrid connection70 MWPlanned1.2 km
FeatherstoneSubstation——1.7 km
NormantonSubstation——2.1 km
Commonside LaneSubstation——2.7 km
Phoenix Healthcare Distribution Centre - Battery StoragePower plant3.4 MWPermitted3.8 km
Phoenix Healthcare Distribution Centre - Solar PanelsPower plant3.2 MWPermitted3.8 km

Operator and place

More from nLighten UK Ltd

Other data centers in England

All 245 data centers in England, United Kingdom