Battery storage 32 MW grid connection at HRS Phase 2

Battery storage 32 MW grid connection at HRS Phase 2 is a planned grid connection in England, United Kingdom, with 32 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at HRS Phase 2)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toNorth Lincolnshire Green Energy Park (matched by coordinates+technology+capacity, 0.26 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toScunthorpe North (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity32 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date6 Oct 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.6228, -0.6964Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: North Lincolnshire Green Energy Park (planning authority The Planning Inspectorate - National Infrastructure, reference EN010116)
  2. Permit applied for: North Lincolnshire Green Energy Park (planning authority The Planning Inspectorate - National Infrastructure, reference EN010116)

How it compares

Battery storage 32 MW grid connection at HRS Phase 2 is the 842nd-largest of 2,533 grid connections in England and the 1,304th-largest of 3,903 in the United Kingdom by capacity; its 32 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England842nd of 2,533319,370 MW<0.1%
United Kingdom1,304th of 3,903446,745 MW<0.1%
All grid connections in our data4,807th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 532 power plants (142 operating, 16,152 MW), 203 substations, 3 transmission lines, 3 data centers and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
EPR Glanford LtdPower plant14 MWOperating0.1 km
North Lincolnshire Green Energy ParkPower plant95 MWPermitted0.3 km
North Lincolnshire Green Energy ParkPower plant30 MWPermitted0.3 km
FlixboroughSubstation——0.5 km
Billet LaneSubstation——2.2 km
FoxhillsSubstation——2.4 km
North Humber to High MarnhamTransmission line—Planned21 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled27 km
ThalesData center——30 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page