Grid connection · England, United Kingdom

Battery storage 16.5 MW grid connection at Balby Generation

Battery storage 16.5 MW grid connection at Balby Generation is a planned grid connection in England, United Kingdom, with 16.5 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Balby Generation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toMallard Way (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toJ3 Business Park - Battery Storage Facility (matched by coordinates+technology+capacity, 0.12 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity16.5 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date25 Sept 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.5044, -1.1262Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: J3 Business Park - Battery Storage Facility (planning authority Doncaster, reference 23/01072/FUL)
  2. Permit applied for: J3 Business Park - Battery Storage Facility (planning authority Doncaster, reference 23/01072/FUL)

How it compares

Battery storage 16.5 MW grid connection at Balby Generation is the 1,158th-largest of 2,533 grid connections in England and the 1,834th-largest of 3,903 in the United Kingdom by capacity; its 16.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,158th of 2,533319,370 MW<0.1%
United Kingdom1,834th of 3,903446,745 MW<0.1%
All grid connections in our data5,630th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 530 power plants (148 operating, 4,309 MW), 294 substations, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
J3 Business Park - Battery Storage FacilityPower plant16 MWPermitted0.1 km
J3 Business Park - Battery Energy Storage FacilityPower plant10 MWUnder construction0.1 km
BalbySubstation——0.5 km
Mallard WaySubstation——0.9 km
ThalesData center——0.9 km
Belmont AvenueSubstation——1.2 km
Amazon LBA2 (Principal Place)Power plant2 MWCancelled2.7 km
North Humber to High MarnhamTransmission line—Planned18 km
HSBC Data CentreData center——24 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page