Power plant · Doncaster, England, United Kingdom

J3 Business Park - Battery Energy Storage Facility

J3 Business Park - Battery Energy Storage Facility is a power plant under construction in Doncaster, England, United Kingdom, with 10 MW of capacity, operated by Forepower Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDoncaster (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressJ3 Business Park, Wright Business Park, Balby Carr Bank, Balby, Doncaster, DN4 8DEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date24 Jan 2023 (permit 22/02368/FUL, Town and Country Planning Act, issued by Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Oct 2022 (ref. 22/02368/FUL, Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Jan 2023 (granted, ref. 22/02368/FUL, Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorForepower LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.5038, -1.1247DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

J3 Business Park - Battery Energy Storage Facility is the 1,441st-largest of 2,174 power plants planned, permitted or under construction in England and the 2,237th-largest of 3,222 in the United Kingdom by capacity; its 10 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,441st of 2,174186,088 MW<0.1%
United Kingdom2,237th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,307th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 502 grid connections (197 operating, 2,128 MW), 295 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Balby Carr Bank grid connectionGrid connection10 MWOperating0.1 km
Battery storage 16.5 MW grid connection at Balby GenerationGrid connection16.5 MWPlanned0.1 km
Gas 30 MW grid connection at Balby Carr GenerationGrid connection30 MWOperating0.1 km
BalbySubstation——0.6 km
Mallard WaySubstation——0.8 km
Belmont AvenueSubstation——1.3 km
North Humber to High MarnhamTransmission line—Planned18 km
Yorkshire GREENTransmission line—Permitted45 km

Operator and place

Grid connections attached to this power plant

More from Forepower Limited

Other power plants in England

All 5809 power plants in England, United Kingdom