Grid connection · England, United Kingdom

Battery storage 15 MW grid connection at Brodsworth BESS

Battery storage 15 MW grid connection at Brodsworth BESS is a planned grid connection in England, United Kingdom, with 15 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Brodsworth BESS)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toDoncaster B/Thorpe Marsh (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toLong Lands Lane (matched by coordinates+technology+capacity, 0.43 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity15 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date10 Mar 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.5672, -1.2128Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage 15 MW grid connection at Brodsworth BESS is the 1,192nd-largest of 2,533 grid connections in England and the 1,890th-largest of 3,903 in the United Kingdom by capacity; its 15 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,192nd of 2,533319,370 MW<0.1%
United Kingdom1,890th of 3,903446,745 MW<0.1%
All grid connections in our data5,413th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 503 power plants (142 operating, 4,392 MW), 355 substations, 10 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
BrodsworthSubstation——0.3 km
Long Lands LanePower plant12 MWCancelled0.4 km
Woodlands - Battery Energy StoragePower plant1.2 MWPermitted0.5 km
Marr Hall Farm, Barnsley Road - Solar FarmPower plant40 MWCancelled2.8 km
BentleySubstation——4.8 km
South ElmsallSubstation——5.0 km
ThalesData center——9.7 km
HSBC Wakefield Data CentreData center——19 km
nLighten LeedsData center——19 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page