Power plant · Doncaster, England, United Kingdom

Woodlands - Battery Energy Storage

Woodlands - Battery Energy Storage is a cancelled battery storage plant in Doncaster, England, United Kingdom, with 1.2 MW of capacity, operated by Infinis Battery Storage Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDoncaster (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressElectricity Sub-station Compound Land To The West Of County Way Woodlands Doncaster, DN6 7PYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Jul 2022 (permit 22/00806/FUL, Town and Country Planning Act, issued by Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Mar 2022 (reference 22/00806/FUL, planning authority Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Jul 2022 (granted, reference 22/00806/FUL, planning authority Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInfinis Battery Storage Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.5659, -1.2060DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Doncaster, reference 22/00806/FUL)
  2. Permit applied for (planning authority Doncaster, reference 22/00806/FUL)

How it compares

Woodlands - Battery Energy Storage is the 3,776th-largest of 4,036 power plants in England and the 5,495th-largest of 5,837 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,776th of 4,036134,406 MW<0.1%
United Kingdom5,495th of 5,837200,833 MW<0.1%
All power plants in our data12,477th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 415 grid connections (216 operating, 2,289 MW), 356 substations, 10 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
BrodsworthSubstation——0.3 km
Battery storage 15 MW grid connection at Brodsworth BESSGrid connection15 MWPlanned0.5 km
Wind 8.2 MW grid connection at Hampole WindfarmGrid connection8.2 MWOperating2.0 km
Solar 2 MW grid connection at BrodsworthGrid connection2 MWPlanned2.8 km
BentleySubstation——4.3 km
South ElmsallSubstation——5.4 km
ThalesData center——9.3 km
HSBC Wakefield Data CentreData center——19 km
nLighten LeedsData center——19 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page