Grid connection · England, United Kingdom

Battens Farm grid connection

Battens Farm grid connection is a planned grid connection in England, United Kingdom, with 10 MW of capacity, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBATTENS FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Yatton Keynell)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBattens Farm Solar Park (matched by name+coordinates+technology+capacity, 0.59 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toYatton Keynell Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity10 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date10 Aug 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date15 Nov 2037 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.4808, -2.1703SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Battens Farm Solar Park
  2. Permit granted: Battens Farm Solar Park (planning authority Wiltshire, reference 13/01311/FUL)
  3. Permit applied for: Battens Farm Solar Park (planning authority Wiltshire, reference 13/01311/FUL)

How it compares

Battens Farm grid connection is the 1,332nd-largest of 2,533 grid connections in England and the 2,105th-largest of 3,903 in the United Kingdom by capacity; its 10 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,332nd of 2,533319,370 MW<0.1%
United Kingdom2,105th of 3,903446,745 MW<0.1%
All grid connections in our data5,969th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 429 power plants (161 operating, 1,917 MW), 83 substations, 8 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battens Farm Solar ParkPower plant11 MWOperating0.6 km
Tiddlywink Barn Battery Storage Power PlantPower plant20 MWCancelled0.9 km
North Allington Solar Farm - Solar FarmPower plant10 MWPermitted0.9 km
Yatton Keynell PrimarySubstation——1.0 km
Rowden PrimarySubstation——4.0 km
Cocklebury PrimarySubstation——4.6 km
Ark Data CentresData center——7.7 km
Data center, England (OSM way 996865179)Data center——7.8 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating21 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page