(ANM) Third Drove grid connection is a planned grid connection in England, United Kingdom, with 50 MW of capacity, held by Cambridge Power Limited.

Map: where (ANM) Third Drove grid connection lies
52.5701, -0.2074 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Walpole)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderCambridge Power LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toThird Drove, Fengate - Battery Storage (matched by shared name+coordinates+technology+capacity, 0.36 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity50 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date2 Aug 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.5701, -0.2074UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Third Drove, Fengate - Battery Storage (planning authority Peterborough, reference 22/00740/FUL)
  2. Permit applied for: Third Drove, Fengate - Battery Storage (planning authority Peterborough, reference 22/00740/FUL)

How it compares

(ANM) Third Drove grid connection is the 669th-largest of 3,539 grid connections in England and the 964th-largest of 4,870 in the United Kingdom by capacity; its 50 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England669th of 3,539341,715 MW<0.1%
United Kingdom964th of 4,870467,981 MW<0.1%
All grid connections in our data4,149th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 396 power plants (139 operating, 4,890 MW), 70 substations, 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Third Drove, Fengate - Battery StoragePower plant50 MWCancelled0.4 km
Fengate Industrial EstatePower plant174 MWCancelled0.7 km
Peterborough EfWPower plant7.3 MWOperating0.7 km
Peterborough East Grid 11kVSubstation——2.0 km
Peterborough Central 11kVSubstation——2.4 km
Peterborough Central 33kVSubstation——2.5 km
Data center, England (OSM way 87850427)Data center——4.0 km
Positive ParkData center——18 km
The Horizon CentreData center——30 km

Holder, grid operator and place