Power plant · Peterborough, England, United Kingdom

Third Drove, Fengate - Battery Storage

Third Drove, Fengate - Battery Storage is a cancelled power plant in Peterborough, England, United Kingdom, with 50 MW of capacity, operated by Flag Fen Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPeterborough (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThird Drove Fengate, PE1 5QRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Jan 2023 (permit 22/00740/FUL, Town and Country Planning Act, issued by Peterborough)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jun 2022 (reference 22/00740/FUL, planning authority Peterborough)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Jan 2023 (granted, reference 22/00740/FUL, planning authority Peterborough)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFlag Fen Power Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5708, -0.2021DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Peterborough, reference 22/00740/FUL)
  2. Permit applied for (planning authority Peterborough, reference 22/00740/FUL)

How it compares

Third Drove, Fengate - Battery Storage is the 193rd-largest of 3,953 power plants in England and the 390th-largest of 5,723 in the United Kingdom by capacity; its 50 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England193rd of 3,95385,679 MW<0.1%
United Kingdom390th of 5,723136,106 MW<0.1%
All power plants in our data1,882nd of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 87850427)Data center——4.4 km
Positive ParkData center——18 km
The Horizon CentreData center——31 km
Triton Knoll Electrical SystemTransmission line—Permitted40 km
Kings Lynn B Connection ProjectTransmission line—Permitted42 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned45 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page