RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) High Road grid connection

(ANM) High Road grid connection is a planned grid connection in England, United Kingdom, with 50 MW of capacity, held by Cambridge Power Limited.

Map: where (ANM) High Road grid connection lies
52.7217, 0.3825 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Walpole)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderCambridge Power LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toHigh Road, Saddlebow - Battery Storage (matched by shared name+coordinates+technology+capacity, 0.41 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity50 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date2 Aug 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.7217, 0.3825UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: High Road, Saddlebow - Battery Storage (planning authority King's Lynn and West Norfolk, reference 22/01151/FM)
  2. Permit granted: High Road, Saddlebow - Battery Storage (appeal granted, planning authority King's Lynn and West Norfolk, reference 22/01151/FM)
  3. Permit refused: High Road, Saddlebow - Battery Storage (planning authority King's Lynn and West Norfolk, reference 22/01151/FM)
  4. Permit applied for: High Road, Saddlebow - Battery Storage (planning authority King's Lynn and West Norfolk, reference 22/01151/FM)

How it compares

(ANM) High Road grid connection is the 604th-largest of 3,539 grid connections in England and the 862nd-largest of 4,870 in the United Kingdom by capacity; its 50 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England604th of 3,539341,715 MW<0.1%
United Kingdom862nd of 4,870467,981 MW<0.1%
All grid connections in our data3,969th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 308 power plants (130 operating, 5,348 MW), 68 substations, 4 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
High Road, Saddlebow - Battery StoragePower plant50 MWPermitted0.4 km
Kings LynnPower plant395 MWOperating0.8 km
Kings Lynn B Connection ProjectTransmission line—Permitted0.9 km
Willows power and recycling centre (EfW)Power plant24.2 MWCancelled0.9 km
Kings Lynn Grid 33kVSubstation——1.8 km
Kings Lynn South Grid 33kVSubstation——1.8 km
Hardwick Rd Primary 11kVSubstation——2.7 km
Longmarsh Green EnergyData center—Planned3.0 km
Positive ParkData center——27 km

Holder, grid operator and place

More from Cambridge Power Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page