(ANM) Long Meadow Solar Farm grid connection

(ANM) Long Meadow Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 12 MW of capacity, held by Low Carbon Solar Park 54 Limited.

Map: where (ANM) Long Meadow Solar Farm grid connection lies
52.0076, 0.2978 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Thaxted Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderLow Carbon Solar Park 54 LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toLong Meadow Solar Farm (matched by name+coordinates+technology+company, 0.62 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity12 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date9 Feb 2022UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2032 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.0076, 0.2978UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Long Meadow Solar Farm
  2. Permit granted: Long Meadow Solar Farm (planning authority Uttlesford, reference UTT/21/0688/FUL)
  3. Permit applied for: Long Meadow Solar Farm (planning authority Uttlesford, reference UTT/21/0688/FUL)

How it compares

(ANM) Long Meadow Solar Farm grid connection is the 1,720th-largest of 3,539 grid connections in England and the 2,440th-largest of 4,870 in the United Kingdom by capacity; its 12 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,720th of 3,539341,715 MW<0.1%
United Kingdom2,440th of 4,870467,981 MW<0.1%
All grid connections in our data6,026th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 321 power plants (132 operating, 3,761 MW), 203 substations, 14 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Long Meadow Solar FarmPower plant19 MWOperating0.6 km
Saffron Walden Primary 11kVSubstation——3.4 km
Acrows Primary 11kVSubstation——3.5 km
Butlers FarmPower plant7.7 MWCancelled4.2 km
Thaxted - Solar farmPower plant40 MWPermitted5.5 km
Thaxted Grid 33kVSubstation——6.3 km
Redcentric CambridgeData center——27 km
West Cambridge Data CentreData center——27 km
Kao Data KLON-02Data center——29 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom