Power plant · Uttlesford, England, United Kingdom

Thaxted - Solar farm

Thaxted - Solar farm is a permitted power plant in Uttlesford, England, United Kingdom, with 40 MW of capacity, operated by Low Carbon.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationUttlesford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand West Of Thaxted, CM6 2QFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Dec 2023 (permit UTT/21/1833/FUL, Town and Country Planning Act, issued by Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Sept 2022 (permit UTT/21/1833/FUL, Town and Country Planning Act, issued by Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Jun 2021 (reference UTT/21/1833/FUL, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Dec 2023 (appeal granted, reference UTT/21/1833/FUL, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Sept 2022 (granted, reference UTT/21/1833/FUL, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLow CarbonDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity40 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area52.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9608, 0.3246DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (appeal granted, planning authority Uttlesford, reference UTT/21/1833/FUL)
  2. Permit granted (planning authority Uttlesford, reference UTT/21/1833/FUL)
  3. Permit applied for (planning authority Uttlesford, reference UTT/21/1833/FUL)

How it compares

Thaxted - Solar farm is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England836th of 2,174185,888 MW<0.1%
United Kingdom1,342nd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,556th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 16 data centers (1 operating, 88 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
NVIDIA Cambridge-1AI supercomputer202 H100eOperating25 km
Kao Data KLON-02Data center——25 km
Kao Data KLON-01Data center——25 km
Redcentric CambridgeData center——32 km
Bramford to TwinsteadTransmission line—Permitted37 km
North London (Electricity Line) ReinforcementTransmission line—Permitted47 km

Operator and place

More from Low Carbon

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page