Power plant · Uttlesford, England, United Kingdom
Butlers Farm
Butlers Farm is a cancelled power plant in Uttlesford, England, United Kingdom, with 7.7 MW of capacity, operated by Push Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Uttlesford (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Butlers Farm, Butlers Lane, Saffron, Walden, Essex, CB10 2ND | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (appeal refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 19 Sept 2014 (reference UTT/14/2755/FUL, planning authority Uttlesford) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 22 Mar 2016 (appeal refused, reference UTT/14/2755/FUL, planning authority Uttlesford) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 16 Mar 2015 (refused, reference UTT/14/2755/FUL, planning authority Uttlesford) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Push Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 7.7 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 7.6 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.0431, 0.2773 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit refused (appeal refused, planning authority Uttlesford, reference UTT/14/2755/FUL)
- Permit refused (planning authority Uttlesford, reference UTT/14/2755/FUL)
- Permit applied for (planning authority Uttlesford, reference UTT/14/2755/FUL)
How it compares
Butlers Farm is the 1,417th-largest of 3,430 power plants in England and the 2,270th-largest of 5,050 in the United Kingdom by capacity; its 7.7 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,417th of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 2,270th of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 7,734th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 11 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Redcentric Cambridge | Data center | — | — | 23 km |
| West Cambridge Data Centre | Data center | — | — | 23 km |
| Kao Data KLON-02 | Data center | — | — | 32 km |
| NVIDIA Cambridge-1 | AI supercomputer | 202 H100e | Operating | 32 km |
| Bramford to Twinstead | Transmission line | — | Permitted | 40 km |
Operator and place
More from Push Energy
- Hatton Solar Farm49.9 MW · permitted
- Yew Tree Farm, Drointon Lane49 MW · planned
- Yew Tree Farm, Drointon Lane30 MW · planned
- Kentish Farm 2 - Battery Energy Storage22.5 MW · planned
- Rolleston Park Farm18.7 MW
- Kentish Farm 2 - Solar Farm16.5 MW · planned
- Croydon / Church Farm (Royston)16.5 MW
- Bassingbourn Solar Farm14.4 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.