Thaxted Grid 33kV Substation

Thaxted Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 49.7 MVA of demand headroom and 44.5 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Thaxted Grid 33kV lies
51.9662, 0.3613 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom49.7 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom44.5 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity114 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.9662, 0.3613UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 338 power plants (130 operating, 3,150 MW), 273 grid connections (171 operating, 2,440 MW), 16 data centers (1 operating, 88 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Spriggs Farm grid connectionGrid connection20 MWOperating0.2 km
Land At Terriers Farm grid connectionGrid connection35 MWOperating0.3 km
Terriers FarmPower plant44 MWOperating0.6 km
Spriggs FarmPower plant12 MWOperating0.7 km
West Thaxted Solar Farm grid connectionGrid connection20 MWPlanned1.9 km
Hyde FarmPower plant10.8 MWOperating2.4 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating27 km
Kao Data KLON-02Data center——27 km
Kao Data KLON-01Data center——27 km